temporary pumping engine and rising main and the construction of a small dam, the cost of which, together with the preliminary and trial works connected with the ultimate scheme, mounted to
8142,025.44
.I
5.
* brutti a no art mɔ I witch ba
İmorao tendo and
vod i det nyt ert Lant mert emigros vindreo "a cruder and
ede dei conabrorte vi den Hor" Tɔibun *7 18πKoJetT efï .sizok
4.
• red que c'ededě to vandenseƐ end ni Sentadago erobdounjeni
or de befgrenade en ovelandTM BNI „Iul .ndos and tɔ 180
DPROC AM plenetet, edzot cikle, T equ*ibrogue de lów ci borðnu
dran, nodtreep ri parodo edt 50“ muon D1 a fodzice ad fuarc
madrerit en delle cdo¥ "moktrinenqeű esTɔtů" ɔt ketiboro Dj
Zirvedede JELUTOR reoubong me motra od „dade chiod caroli oii.wi
edi fuore yer vald end to exto" red." odd tɔ drar end ta
e.rik? sans? «eð?? dựT nuršɣT" c‡o¥ ©oð að bed there
© Idrychinta ti tõidɛray ci resate pel 9- sulov ná? ."nobdec?
2010,258 viɛdmiron, qu
vetro co reorady komin odd one girivolio? ENT
mituotre vis væri to witresen er$ (2021 --1
-es drändrik 1TH. Pes a lyɔde IV Do vežo end to plaque eNT TO? BÁTOK
„A-1-) · Jacving inii eðal ert to privha ert vo Fuż dworagge savne
„tendre el ireng trelict eit se golovch & Deliset ry di
г
.....8
fecelgrama car der ewral erið ná „medve "o eg rode and mɔ? besilidu
feind toe gurlukleng evictedme to des signes end bed ditepoo
man con I get mod w "eererni në tot boen er en time panor tarogard a to nihan tonersévé miadnen đứ1~ beenɔng að hefbook gaw
+ VI 6. The duemurung feF*ily.
The modified scheme included the construction of what is known as the Intermediate Reservoir (capacity, about 200 million gallons), the laying of large suction and rising mains, the erection of a pumping station and provision of pumping machinery and other contingent works, the whole being designated "Tytom Tuk Scheme First Section". The works comprised under the modified scheme were begun in 1904 and completed in 1908, the cost amounting to 8896,139.64.
6.
7.
-
-
The combined expenditure on the emergency works and on the modified scheme all of which was debited to the Vote "Tytam Tuk Scheme, First Section" amounted to $1,038,165.08.
In carrying out the "First Section", a suction main, consisting of cast-iron pipes, 18" in diameter, had to be loid from the Intermediate Reservoir to the Pumping Station, but as this main would be submerged by the construction of the larger reservoir contemplated lower down the valley, it was expressly provided that it should be taken up and that the pipes should be utilized in laying additional rising mains which would be required in connection with the larger scheme.
8.
For the lack of funds, the "Second Section" of the scheme was allowed to remain in abeyance until 1912. The works comprised in this scheme, which were estimated to cost 82,455,000, were begun in October, 1912, and are now drawing to
a close.
9.
In preparing the estimate for the "Second Section", the number of pipes and quantity of lead which would be recovered from the suction main laid under the "First Section"
.:: -
as molded Day
eð "clubri congr yomgre...A ENT
XT TOGE
were
estimated for, certain allowances being made for breakages in taking up the pipes and in transporting them to their new positions and for other matters. Further, in indenting for the